Red Brick Herringbone Path
The project begins with excavating soil. A layer of crushed concrete is added for a strong foundation. Paver sand is then screeded over the crushed concrete to provide a flat and level surface to lay the brick.
Block edging is installed and a string line is run to ensure the first bricks are laid as straight as possible.
Our herringbone pattern is then established. The pattern is centered on the pathway.
The Final Product. The path is complete…
Final cuts are made to the corners and ends.
Polymeric sand is added to the joints and then activated with a light misting of water.